×

Hinweis

There was a problem rendering your image gallery. Please make sure that the folder you are using in the Simple Image Gallery plugin tags exists and contains valid image files. The plugin could not locate the folder: images/2018/2018.04.24.U

Warning: imagejpeg(): gd-jpeg: JPEG library reports unrecoverable error: in /var/www/vhosts/ff-schaerding.at/httpdocs/plugins/content/jw_sig/jw_sig/includes/helper.php on line 152

Warning: imagejpeg(): gd-jpeg: JPEG library reports unrecoverable error: in /var/www/vhosts/ff-schaerding.at/httpdocs/plugins/content/jw_sig/jw_sig/includes/helper.php on line 152

Warning: imagejpeg(): gd-jpeg: JPEG library reports unrecoverable error: in /var/www/vhosts/ff-schaerding.at/httpdocs/plugins/content/jw_sig/jw_sig/includes/helper.php on line 152

Warning: imagejpeg(/var/www/vhosts/ff-schaerding.at/httpdocs/cache/jw_sig/jw_sig_cache_68b7006df1_dsc_0014.jpg): failed to open stream: Disk quota exceeded in /var/www/vhosts/ff-schaerding.at/httpdocs/plugins/content/jw_sig/jw_sig/includes/helper.php on line 152

Die FF Schärding besuchte heute mit 42 Mann die Baustelle des neuen Hotels am Unteren Stadtplatz, welches noch heuer eröffnet werden soll. Bei einem Rundgang zeigten der Hausherr sowie der Architekt das komplexe Gebäude, welches aus 6 Einzelgebäuden besteht. Auch ein Teil der brandschutztechnischen Einrichtungen wie die trockene Steigleitung und die Rauch- und Wärmeabzugsanlagen konnten bereits besichtigt werden. Zuletzt wurden auch noch die in der Schärdinger Altstadt sehr wichtigen Drehleiteraufstellflächen getestet.

 

 

 

{gallery}2018/2018.04.24.U{/gallery}